BTG大联锁措施.docx
《BTG大联锁措施.docx》由会员分享,可在线阅读,更多相关《BTG大联锁措施.docx(9页珍藏版)》请在优知文库上搜索。
1、印尼BATAMTJK2x65MW燃煤电站工程BTG大联锁调试措施PROCEDUREOFBTGINTER1.OCKFORINDONESIABATAMTJK265MWCOA1.-FIREDPOWERP1.ANTDec.20212021年12月ITEMNO.:Conpliedby:编写:Revisedby:审核:Approvedby:批准目录Contents1 .平安考前须知Safetyprecautions2 .调试目的Purpose3 .仪器设备Equipment4 .编制依据Reference5 .调试范围Scopeofcommissioning6 .调试前必需具备的条件Conditionso
2、fcommissioning7 .调试步骤Processofcommissioning8 .调试合格标准Acceptanceofcommissioningresult9 .附录Appendices1 .平安考前须知SafetyDrecauticns全部忒验人员应严格遵守本现场的各种平安工作规定,确保试验平安牢靠的进展AIlPer$onnelparticipatedincommissioningshouldstrictlyfollowthecommissioningprocedureandsitesafetyrulesinordertoensurethattasksareperformedina
3、safeandorderlyway.试验过程应统一组织统一指挥:Testingandcommissioningshallbewellorganizedandconductedunderunifiedcommand.在试验过程中如有危及人身及设备平安的状况,应马上停顿试脸:Incaseofanyabnormalconditionsleading(opersonalinjuryandequipmentdamage,suspendtestingimmediatelyandtakecorrectivemeasures.试验过程中合发电机出口断路器和会场断路器时,做好平安隔离措施,防止发电机误上电。Bc
4、suretoisolatethegeneratorsystemelectricallybeforeclosinggeneratorCBandmagneticfieldCBtopreventinadvertentenergizingthegenerator.2 .调试目的CjmmissiincDunwse为了指导及标准系统及设备的调试工作,检验系统的性能,发觉并消退可能存在的缺陷,保证系统及设备能够平安正常投入运行.Instmclandregulatethesystemandequipmentscommissioning.Verifysystemperformance.Discoverandel
5、iminatedefectsmightexist.Ensurethesystemandequipmentscanbepulintooperationsafelyandnormally.3 .仪器设备EaUiDinent以F全部的仪器已经过校验.AHtheinstrumentsbelowhavealreadycalibrated.3 .1万用表:F1.lKE17BMultimeter:F1.UKEI7B3.2信号发生器:F1.UKE744SignalSource:F1.UKE7444 .编IM依据Reference设计图纸Designdrawing制造厂家产品说明书Manufactureprod
6、uctdocument5 .调试范围机组BTG大联锁,即纲炉、汽轮机、发电机之间的联锁关系。Boilcr-Turbinc-Gcncrator(BTG)interlockisthelogicrelationshipbetweentheoperationsonboiler,turbineandgenerator.5.1 锅炉主爱护MFT动作信号送到ETS联跳汽轮机,汽轮机跳闸后,通过逆功率爱护跳闸发电机。ThesignalMFT(masterfueltrip)iniiatestheETStotripheturbine,aftertheturbinetripped,hegeneratorwillbe
7、trippedoffbyreverse-powerprotection.5.2 发电机主强护动作联跳汽轮机。汽轮机跳闸后,锅炉负荷(蒸汽流垃)大于30%,触发锅炉MFT动作。Theoperationofgeneratormainprotectionswillintertriptheturbine,whichwill,inturn,initiateMFTiftheboilerload(mainsteamflow)isgreaterthan30%.6,调试防必需具备的条件Cnditiuns(fcmmii)ni11E6.1 机组分系统试运工作完毕,分系统试运中出现的何时已全部处理完毕:Testing
- 配套讲稿:
如PPT文件的首页显示word图标,表示该PPT已包含配套word讲稿。双击word图标可打开word文档。
- 特殊限制:
部分文档作品中含有的国旗、国徽等图片,仅作为作品整体效果示例展示,禁止商用。设计者仅对作品中独创性部分享有著作权。
- 关 键 词:
- BTG 联锁 措施